Skip to Page Content | Skip to Site Navigation | Skip to Section Navigation

Capital Markets Execution Document Checklist

Full Underwriting Package
Standard Delivery

(Revised 5/2008)

(Please see referenced Capital Markets Execution Addendum or Multifamily Seller/Servicer Guide sections for a full description of each item listed)

Guide Section
Description
17.10(a)
Application fee
17.10(b)
Copy of written Quote, if applicable, or date and terms of the verbal Quote the Borrower has selected
17.10(c)
Seller's certification, including
  • Seller's compliance with representations and warranties
  • Seller's determination that neither the Borrower nor any Borrower Principal is named a "specially designated national and blocked person" (SDN) on the current U.S. Treasury Department Office of Foreign Assets Control (OFAC) list
17.10(d)
Mortgage transaction narrative analysis (updated from preliminary, as necessary)
[Must include characteristics of the proposed Mortgage (including risk factors and Seller’s recommendation); descriptions of the Property, the Borrower and the property manager; Property’s financial analysis; evaluation of balloon risk; surrounding property uses and condition with neighboring facilities; market analysis; history of the Borrower’s equity; review of third-party reports; loan history if there is an existing mortgage on the Property; proposed sources and uses of funds; tenancy characteristics; and cash equity at risk] [See Section 17.2(h)]
17.10(e)
Borrower Certificate (Form 1115) for each Borrower and Borrower Principal
17.10(f)
Certified financial statements of Borrower and Borrower Principals [See Section 17.2(f)]
17.10(g)
Credit reports [See Section 17.2(j)]
17.10(h)
Real Estate Schedule (Form 1116) [See Section 17.2(k)]
17.10(i)
Wood-boring insect inspection report, if applicable
17.10(j)
Certified rent schedule, dated within 30 days of package submission [See Section 17.2(i)]
17.10(k)
Certified historical property operating statements for the three preceding completed fiscal years [See Section 17.2(f)]
17.10(l)
Certified current property operating statements for the trailing 12- months (broken out on a monthly basis and dated within 30 days of package submission) [See Section 17.2(f)]
17.10(m)
Updated Seller’s pro forma property operating statements [See Section 17.2(f)]
17.10(n)
Inspection and rent verification schedule
17.10(o)
Flood zone determination (FZD) meeting the requirements of Section 31.9
17.10(p)
Appraisal (See Chapter 12)
17.10(q)
Environmental report (See Chapter 13)
17.10(r)
Engineering report or engineering survey (See Chapter 14)
17.10(s)
Aerial photographs, if applicable, labeled with an arrow indicating North and labeled to indicate points of interest
17.10(t)
Proof of zoning; damage restoration statement (See Section 8.5)
17.10(u)
Building code documentation
17.10(v)
Access easement and amenity and/or recreational facility easements, both with analysis and recommendations, if applicable (See Sections 8.8 and 8.9)
17.10(w)
Laundry lease, if applicable [See Section 8.11(b)]
17.10(x)
Commercial leases, if applicable [See Sections 8.2(b) and 8.11(a)]
17.10(y)
Management plan or management agreement
17.10(z)
Ground lease information, if applicable (See Chapter 30)
17.10(aa)
Registration of rental units, if applicable
17.10(ab)
Personal property exclusion list, if applicable
17.10(ac)
Seller's mortgage loan application with Borrower, including authorization to use property and transaction information
17.10(ad)
Borrower's, SPE Equity Owner's and/or guarantor's organizational documents (See Section 9.7)
17.10(af)
Evidence of insurance, Seller/Servicer Certification of Insurance Coverage (Form 1133) and amount of required insurance premium
17.10(ag)
Moisture Management Plan [See Section 8.3(a)], if applicable (If the Moisture Management Plan is required but not yet available, it must be submitted with the final delivery package.)
17.10(ah)
Real estate tax bill (most recent from Property’s local governing body)
17.10(ai)
Purchase agreement and purchase agreement analysis [See Section 17.2(m)]
17.10(ak)
Certified breakdown of construction costs, if Borrower built the Property and the Property is less than one year old
17.10(al)
Preliminary legal issues memorandum
17.10(am)
Additional documentation:
 
______________________________________
 
______________________________________
 
______________________________________
 
______________________________________

 

Back to Top